Our Location
Leonards Road, Ivybridge
Devon, PL21 0RU

Boilerworks Road

On behalf of Robertson Developments Ltd, John Grimes Partnership carried out a preliminary ground investigation and reported on the presence of arsenic contamination within soils on the site of the proposed residential development at BoilerWorks Road, Camborne.

Spatial statistics were used to map the levels of arsenic on the site to enable a cost effective remediation strategy to be developed.

To the right is a plan showing areas with arsenic levels greater than 300mg/kg based on interpolation of data.  Dark areas have levels grater than 300 mg/kg

Geotechnical Engineering Services